Installation: The hardware cabin of Luobang Shangpin is arranged by the factory with professional technicians on-site, and all operations are completed within one day, including wiring and power on, whole machine debugging, pressure stability testing, operation and safety training; The software cabin has a low entry barrier, and customers can assemble it themselves in about 2 hours according to the accompanying instructions. The entire process is equipped with dedicated customer service video remote guidance.
The customer needs to prepare four items in advance: 1. Review the site size in advance, reserve cabin space, and add a 60cm maintenance channel; 2. Prepare compliant 220V/10A grounded power sockets; 3. Ensure that the ground is level and the load-bearing capacity meets the equipment requirements; 4. Check the elevator, hallway, and entrance doors in advance to confirm smooth entry.
After placing the order, the complete 'Entry Preparation List' will be sent synchronously, and each item can be compared and prepared.





(Disclaimer: Respect originality, the copyright of images and text belongs to the original author!)
(Manufacturer of hyperbaric oxygen chamber Whatsapp:)